Search
Close this search box.

Magnets for Green Energy

A Case Study: Saving Energy

The challenge:

 

To avoid scale in large diameter cooling tower pipes.

 

The solution:

Special magnetic design based on the Halbach array, to obtain a maximal magnetic field in a large diameter (12”) magnetic assembly, involves the use of laser welding.

 

Select your currency
USD United States (US) dollar